Guidelines for Yarn Package Dyeing Machine Installations

Mar 19, 2022

1. The location of the Yarn Package Dyeing Machine should be confirmed first, but before the installation, the space for the maintenance and operation of the dyeing machine should be reserved for future operation and protection.

Second, the dyeing machine should be installed on a relatively firm and flat foundation, and the dyeing machine should be fixed with the special screws of the foot.

3. After confirming the installation position of the dyeing machine, use a special instrument to check the dyeing machine, mainly to check whether its levelness meets the requirements. If the levelness is not correct, it needs to be aligned before installation.

4. Place the three-phase, four-wire and other power lines of the dyeing machine in a special wire box for the machine.

5. During the whole process of Yarn Package Dyeing Machine installation, the dyeing machine should be grounded to ensure the safety of daily use of the dyeing machine.


You Might Also Like