What details should be paid attention to when replacing the Jig Dyeing Machine heating tube?

Apr 16, 2025

Safety
1. Power-off operation: Before replacing the heating tube, be sure to cut off the power supply of the Jig Dyeing Machine and make sure the power switch is in the off state. At the same time, hang a warning sign to prevent others from mistakenly operating the power supply and causing electric shock.
2. Prevent burns: Even if the Jig Dyeing Machine has stopped running for a period of time, the heating tube may still have residual heat. Avoid touching the surface of the heating tube directly during disassembly and installation to prevent burns.
3. Wear protective equipment: Correctly wear personal protective equipment such as protective gloves and goggles to avoid accidental injuries during operation, such as scratches by tools or splashes of dye into the eyes.
Installation link
1. Heating tube specification matching: The replaced heating tube must be completely consistent with the specifications, size, power and other parameters of the original heating tube to ensure that it can work properly, and match the control system of the Jig Dyeing Machine to avoid uneven heating or equipment damage due to parameter mismatch.
2. Accurate installation position: The heating tube should be installed in the original position to ensure that it is in full contact with the liquid in the dye tank and is firmly installed to avoid shaking or displacement during operation, which will affect the heating effect and equipment stability.
3. Good connection and sealing: The connection between the heating tube and the pipeline and power cord must ensure good sealing. The pipeline connection is sealed with a suitable gasket or sealant to prevent leakage of dye liquid; the power cord connection should be tight to prevent false connection from causing heating, sparking and other safety hazards.
4. Avoid impurities from entering: During the installation process, pay attention to keeping the heating tube and the installation site clean to prevent debris, dust, metal chips and other impurities from entering the dye tank or heating tube to avoid affecting the heating effect or causing pipeline blockage.
Debugging and inspection
1. Check the line connection: After the installation is completed, carefully check whether the power cord, control line and other line connections of the heating tube are correct, whether there is looseness, short circuit, etc., to ensure the safety and reliability of the electrical system.
2. Test the heating function: During the startup and debugging, closely observe the heating of the heating tube, including whether the temperature rise is normal and uniform, and whether the temperature control is accurate. If there is any abnormality, the machine should be stopped for inspection immediately, and debugging should be continued after troubleshooting.
3. Comprehensive inspection of the equipment: During the debugging process, not only should attention be paid to the operation of the heating tube, but also the overall performance of the Jig Dyeing Machine should be checked, such as whether the dye circulation system, transmission system, etc. are operating normally, to ensure that the equipment can work normally after replacing the heating tube.